Greenland Road

Road Widening Project

Project Overview

Vista delivered a full-scale highway improvement on Powlett Road, completed on time and within a fixed budget. Working closely with Hartlepool Borough Council, we ensured zero extra costs and achieved first-time approval.

Works Involved

  • Carriageway widening to improve traffic flow
  • Full-depth footway reconstruction with new kerbs and tactile paving
  • Resurfaced cycleways and reconstructed grass verges
  • Installation of road markings and updated signage

BEFORE

AFTER

Site Challenges

The site presented narrow working areas and unforeseen ground conditions. Through proactive collaboration with the designer and adopting authority, Vista adjusted the capping layer depth and resolved level discrepancies without impacting the schedule. Our consult-and-construct approach kept the project on track, minimised disruption for residents, and ensured smooth, safe, and long-lasting road improvements.

Local Authority Testimonial

Client Testimonial

"The scheme was carried out with professionalism and completed in the agreed timescale. I am looking forward to working with Vista on the next scheme in Hartlepool!”

Contact

Get in touch

Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.