Complex section 278 infrastructure scheme progressed utilising Vista’s consult and construct package resulting onto maintenance with the City of York Council.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

CONTINUOUS LIAISONS WITH RESIDENTS

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

2 WEEK PROJECT DURATION

IMMEDIATE SIGN-OFF AND MAINTENANCE ACHIEVED

Works Involved

· Grass verge construction.
· Full depth footway reconstruction including tactile paving and new kerb lines.
· Carriageway resurfacing.
· Relocation of highway gully and cleaning of existing unit.
· Installation of road markings.
· Full traffic management throughout.
· Installation of 2 No. speed humps.

BEFORE

AFTER

Site Challenges

Given the location on a busy side road, it was crucial to have a comprehensive traffic management plan in place. With multiple local public amenities nearby such as a school, nursery, library, and retirement home, maintaining safety was our top priority. Due to the sites constraints, a road closure with two-way temporary traffic lights was implemented. With the road being located on a bus route, extensive communication with the local residents was fundamental. This included informing them about the project's schedule and providing updates on how to access their properties during the works.
The project was completed efficiently and to a high standard to ensure that maintenance was granted first time.

Local Authority Testimonial

Client Testimonial

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Get in touch

Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.