Bellway Homes, West Midlands

Jubilee Green, Coventry

Project Overview

New build Section 278 infrastructure scheme progressed onto maintenance with Coventry City Council.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

CONTINUOUS LIAISONS WITH 80+ RESIDENTS

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

5 WEEK PROJECT DURATION

IMMEDIATE SIGN-OFF AND MAINTENANCE ACHIEVED

Works Involved

• Installed a new highway drainage system to effectively manage the surface water runoff.

• Strategically placed new pedestrian crossings to improve accessibility and safety for pedestrian traffic.

• Reconstructed and upgraded kerbs and footways adhering to the Council’s specifications.

• Installed new bollards to protect existing assets and provide additional safety to pedestrians.

• Carried out comprehensive resurfacing of the entire carriageway.

• Coordinated with the Local Authority to minimise disruption during the resurfacing process, ensuring timely completion.

BEFORE

AFTER

Site Challenges

The project faced significant challenges, including busy vehicular and pedestrian traffic which required meticulous traffic management planning and advanced control measures to ensure safety. The proximity of residents’ driveways to the works area required constant communication and temporary access solutions to minimise inconvenience.

Additionally, the single access and egress point for the new development demanded careful scheduling and coordination to ensure smooth delivery of the works. Deliveries and heavy machinery movements were planned during off$peak hours to reduce the impact to the community.

These challenges were successfully managed through proactive planning, community engagement, and innovative construction techniques, ensuring the project was completed on time and to the highest standards.

Local Authority Testimonial

Client Testimonial

“We engaged Vista for this project because we had a complex Section 278 Agreement requiring extensive negotiations on technical issues with the council. The situation was challenging, as the existing technical approval had been disregarded, leaving us with an undeliverable S278.


Thanks to Vista's excellent work and superb liaison with the council, this S278 is now successfully on maintenance which is an outcome that seemed impossible a year ago.

Throughout the project, Vista kept us well$informed with regular updates and delivered work of an excellent standard.


Their professional approach and ability to take care of the job made a significant difference would highly recommend their services to anyone facing similar challenges”

Thomas Harrison — Bellway Homes West Midlands - Adoptions Engineer

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Get in touch

Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.